Skip to content

Terbium

Terbium 3D Printer Journal

Repo: github.com/akulsaju/terbium
CAD Hours: “99h 23m”


February 10, 2024

Task: Project Planning
Time: 20 minutes
Notes:

  • Defined core objectives: affordability, modularity, and compatibility with standard components.
  • Researched frame materials and motion systems (Cartesian vs. CoreXY).

February 11, 2024

Task: Preliminary Research
Time: 1 hour
Notes:

  • Reviewed open-source printer designs (Prusa i3, Ender 3) for inspiration.
  • Selected GT2 belts and NEMA17 motors for cost-effectiveness.

February 14, 2024

Task: Component Sourcing Plan
Time: 3 hours
Notes:

  • Drafted initial BOM with AliExpress parts:
    • Motion: MGN9C rails, 8mm linear rods, LM8LUU bearings.
    • Electronics: 24V PSU, BLTouch, modular mainboard.
  • Highlighted risks: inconsistent motor specs, rail tolerances.

February 16–18, 2024

Task: CAD Modeling (Frame & Y-Axis)
Time: 15.5 hours
Notes:

  • Frame: Designed 2020 aluminum extrusion structure in Onshape.
  • Y-Axis:
    • Dual 8mm linear rods with LM8LUU bearings.
    • Unit error discovered (cm instead of mm), requiring full redesign.
    • Implemented spring-loaded GT2 belt tensioners post-correction.

February 21, 2024

Task: Y-Axis Optimization & Bed Design
Time: 5.5 hours
Notes:

  • Adjusted pulley alignment to prevent belt derailment.
  • Modeled 210x210mm heated bed with silicone thermal pads.

February 22–23, 2024

Task: Z-Axis & Printhead Development
Time: 6 hours
Notes:

  • Z-Axis: Switched from lead screws to belts due to wobble in simulation.
  • Printhead: Designed modular mount for Bambu X1-style hotend with dual 4010 cooling fans.

February 26–28, 2024

Task: Thermal & Structural Analysis
Time: 5.5 hours
Notes:

  • CFD: Revised fan ducts to reduce turbulent airflow.
  • Frame Rigidity: Added cross-bracing to reduce resonant vibrations.

March 1–5, 2024

Task: Motion System Refinement
Time: 11 hours
Notes:

  • Upgraded to fiberglass-reinforced GT2 belts to minimize resonance.
  • Integrated 3:1 gear reduction for improved motor torque.

March 7–20, 2024

Task: Final Assembly Checks
Time: 10 hours
Notes:

  • Adjusted X-axis carriage to prevent collisions with Z-axis brackets.
  • Validated bed leveling mechanism (±0.1mm precision).

Overall


Terbium: Because buying a printer is for nerds with money. 💸🔥

Pics